- When installing, the solenoid valve coil should be upward and keep the vertical position. The arrow or mark on the solenoid valve should be consistent with the flow direction of the pipeline, and it should not be installed in a place with splashing or leaking water.
- The working medium of the imported solenoid valve should be clean without particles and impurities, and the dirt and filters on the surface of the solenoid valve internal parts should be cleaned regularly.
- When the solenoid valve fails, in order to isolate the solenoid valve in time and ensure the normal operation of the system, it is best to install a bypass device
- In the pipeline system, the diameter of the solenoid valve installed on the branch should be smaller than that of the main pipeline valve.
- Before installing the solenoid valve, the pipeline must be cleaned. It is recommended to install a filter before the valve and a trap for the steam line.
- The valve cannot be installed in the low recess of the pipeline, so as not to hinder the action due to the precipitation of steam condensed water and impurities in the valve.
- It cannot be used in explosion-hazardous occasions.
- When the rigidity of the pipeline is insufficient, it is recommended to fix the pipeline in front of the valve with a bracket to avoid vibration when the solenoid valve is working.
- Before installation, pay attention to the product label, read the instruction manual carefully, and judge whether the product meets the conditions of use.
- Pressure gauges should be installed on the pipelines before and after the solenoid valve to observe the pipeline pressure.
www.cnzorgon.com/installation-instructions-for-high-temperature-solenoid-valves.html